A value just inside the limit
A shaft must have a diameter of 20.00 ± 0.02 mm. A part is measured at 20.018 mm. It is within tolerance, so it is approved. Or is it? The gauge has a resolution of 0.001 mm, but the true value may differ from the displayed one by several thousandths, depending on the gauge’s calibration, the temperature and how the measurement was made. If the true value is 20.023 mm, the part does not meet the requirement.
The measurement uncertainty is the answer to the question of how far from the displayed value the true value may lie.
What measurement uncertainty is
The international guide to measurement uncertainty, the GUM (JCGM 100:2008), describes measurement uncertainty as a measure of the dispersion of the values that can reasonably be attributed to what is being measured. A complete measurement result is therefore written as a value and an uncertainty, for example 20.018 ± 0.004 mm.
The uncertainty is determined by listing everything that can affect the result and estimating how much each part contributes. The list is called an uncertainty budget. Typical contributions for a length measurement are:
- the uncertainty of the reference, from the gauge’s calibration certificate
- the resolution of the gauge
- the temperature, because part and gauge expand by different amounts
- the repeatability, that is, the spread when the same measurement is repeated
- differences between operators, fixtures and measuring stations
The GUM groups the contributions by how they are estimated. Type A is calculated statistically from repeated measurements. Type B is estimated in another way, for example from a certificate, a specification or experience. The contributions are expressed as standard uncertainties and combined into a combined standard uncertainty. This is then multiplied by a coverage factor k, often k = 2, to give an expanded uncertainty U. With k = 2 and normally distributed contributions, the interval corresponds to a probability of about 95%.
Measurement uncertainty and MSA
Measurement uncertainty and measurement system analysis (MSA) are often mixed up, but they answer different questions.
- An uncertainty budget according to the GUM describes how certain a single measurement result is. It builds the uncertainty from the bottom up, contribution by contribution, and also includes systematic contributions such as the uncertainty of the reference.
- An MSA, for example a Gage R&R study, describes how much the measurement system varies when it is used as in production, with real parts and operators. The result is compared with the process variation or with the tolerance to decide whether the measurement system is good enough for its task.
They complement each other. The repeatability and reproducibility from a Gage R&R study can be contributions in the uncertainty budget. And a budget can show which contribution is largest, and therefore what needs improving, when an MSA study shows that the measurement system varies too much.
Uncertainty near the tolerance limit
In the middle of the tolerance the uncertainty rarely matters: even if the true value is a few thousandths away, the part is approved. Near a limit it is different. There the interval around the measured value can reach beyond the limit, and then you cannot say for certain whether the part meets the requirement.