Role
Engineering and planning: what changed?
Process and production engineering need to understand what has changed, what it affects, and whether the standard should change.
Questions and decisions
From question to evidence
Each question needs certain evidence to be answered. Together they lead to what the role needs afterwards.
Engineering and planning asks
What is needed to answer
Afterwards
Question 1: "What changed?"
Needs: History for the process
Question 2: "What is affected?"
Needs: When tools, material or settings were changed
Question 3: "Should the standard change?"
Needs: Earlier similar events
Afterwards
A changed standard or instruction, with the effect visible in the next period.
Situations
Where the questions arise
Each situation is described once. Here you see the question and the decision for this particular role.
Situation
Values creep towards the limit
Read about the situation"Why is the tool behaving differently, and should the change interval be adjusted?"
Decision: Whether the tool change standard should change.
Situation
A part measures outside tolerance
Read about the situation"Is this a one-off or a change in the process?"
Decision: Whether the process needs investigating.
Situation
Two operators, same part, different values
Read about the situation"Does the measurement method or the fixture need to change?"
Decision: A change of measurement method, fixture or gauge.
Situation
The machine is down
Read about the situation"Is the same reason recurring?"
Decision: Whether an improvement or a maintenance job should be done.
Behind the questions
Does the dimension follow a process value?
When a process value, for example the temperature, is saved with the same serial number as the dimension, you can see whether they move together. The serial number is an annotation on the measured value. A correlation shows where it is worth looking for what changed, not what caused it.
Does the dimension follow a process value, for example the temperature?
Illustration · Example dataWhen the process value and the dimension belong to the same part, through the serial number, you can see whether they move together. A correlation shows where it is worth looking. It does not prove what causes the deviation.
Step by step
- Each point is one part. The mould temperature comes from the machine and the dimension from the measurement, and they are linked by the serial number of the part.
- The dimension should be 25.00 ± 0.10. Every part in the example is within tolerance.
- The higher the temperature, the larger the dimension. The parts from the hottest cycles, above about 55 °C, are close to the upper tolerance limit.
- The correlation shows where it is worth investigating. It does not prove that the temperature is the cause.
Why do annotations make a measured value more useful?
Illustration · Example dataA value without context can only be compared with its limit. With operator, serial number, order, machine and cavity it can be filtered, compared and traced.
Step by step
- The value 12.51 is linked to operator, serial number, order, machine and cavity.
- The cavity number makes it possible to compare cavities with each other.
- Serial number and order make it possible to trace a single part and answer the customer.