Values creeping towards the limit
A dimension has been stable for weeks. During one shift the values move slowly towards the upper tolerance limit, but every part is still accepted. The operator wonders whether to adjust. Quality wonders whether the process has changed. Production wonders whether a tool change should be planned.
Without a way to tell normal variation from a real change, the answer is a feeling. Statistical process control gives everyone the same basis for the decision. In everyday speech it is often just called process control.
Common causes and special causes
Variation comes in two kinds. Common causes are the many small factors that are always present: slight differences in material, temperature, set-up and measurement. Together they give a spread that is stable and predictable. Special causes are specific events that change the process, such as a worn tool, a new batch of material or a changed setting.
A process affected only by common causes is called stable, or in statistical control. You can predict how it will behave. Adjusting a stable process because of normal variation, chasing every value, tends to make the spread larger, not smaller.
The control chart
The tool for telling the two apart is the control chart. Small subgroups are measured at regular intervals and plotted in time order, together with a centre line and control limits calculated from the process’s own data, typically three standard deviations from the centre line.
The most common charts are:
- X̄-R: subgroup means and ranges, for subgroups of a few parts, for example five parts every hour.
- X̄-s: as X̄-R but with the standard deviation, for larger subgroups.
- Individuals and moving range (I-MR): when each measurement is its own subgroup, for example when testing is expensive or production slow.
- Attribute charts (p, np, c, u): for the proportion or count of defects, when the result is pass or fail rather than a measured value.
Control limits are not tolerance limits. A process can give a signal while every part is good, and it can be stable while producing parts outside tolerance. The first is an early warning. The second means the process needs improving or the requirement needs reviewing; adjusting will not fix it.